Miscellaneous » Phase 1 Construction Photos » September 2014

September 2014

geothermal field Vault in geothermal field: 6 fields of 10 bores (wells) each will tie into this
piping that will be trenched underground that will connect central unit with the school building connecting pipes together
trench to connect one field of 10 wells together pipes bored underground to south end of school that will carry water between geothermal wellfield central unit and the school building.
Roof with vents and skylights installed (view from southwest) Roof as seen from northwest
Looking into vault from top filling pipes in vault with water-glycol mixture